2004 Transcript[221]

Click to download
Reviews
Shared by: 28e67f4eea39e297
Stats
views:
4
rating:
not rated
reviews:
0
posted:
6/15/2009
language:
English
pages:
0
1 1 2 3 4 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION +++++ COMMISSION BRIEFING 5 BRIEFING ON OFFICE OF NUCLEAR REACTOR REGULATION (NRR) 6 7 8 9 10 11 12 13 14 The Commission met in open session, pursuant to 15 notice, Chairman Nils J. Diaz, presiding. 16 17 COMMISSIONERS PRESENT: 18 19 20 21 22 NILS J. DIAZ, Chairman of the Commission EDWARD MCGAFFIGAN, JR., Member of the Commission JEFFREY MERRIFIELD, Member of the Commission PROGRAMS, PERFORMANCE AND PLANS +++++ Nuclear Regulatory Commission One White Flint North Rockville, MD Wednesday, March 24, 2004 2 1 (This transcript produced from electronic caption 2 media and audio and video media provided by the 3 Nuclear Regulatory Commission) 4 STAFF AND PRESENTERS SEATED AT THE COMMISSION TABLE: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Secretary General Counsel DR. WILLIAM TRAVERS, EDO SAMUEL COLLINS, DEDO JIM DYER, Director, NRR DR. BRIAN SHERON, AD for Proj. Lic. & Tech Analy. JAMES CALDWELL, Region III Administrator JOHN CRAIG, AD for Inspection and Programs STUART RICHARDS SUZANNE BLACK ERIC LEEDS DAVID MATTHEWS JAMES LYONS 3 1 2 PROCEEDINGS CHAIRMAN DIAZ: Good morning again. We are 3 pleased to be meeting this morning to hear a lot of 4 good things about Nuclear Reactor Regulation and all 5 of the small number of issues that we deal with every 6 day. 7 We are hearing some competition from NMSS 8 now. They are getting as many issues as you guys 9 have. But we realize that NRR is responsible for 10 implementing many of the Commission's key programs, 11 including the licensing and oversight of reactors, 12 license renewal, power uprates, design 13 certifications and early site permits. And I'm sure 14 there are a few more items that we do not see that 15 often that you do every day and do them well. 16 In addition, NRR has a number of important 17 initiatives and technical issues on its plate. I 18 would like to take this opportunity to acknowledge 19 one specific staff activity that they can be rightly 20 proud of, that is the extraordinary, thorough 21 oversight of Davis-Besse restart activities provided 22 by NRR for a long period of time with tremendous 4 1 amount of dedication by the staff in support of 2 Region III and with the tremendous amount of work 3 done by Davis-Besse Restart Oversight Panel. We 4 thank you. 5 Last year, NRR discussed the many 6 challenges that were ahead for NRR including programs 7 that affect the public and our other stakeholders. 8 This included improvements to the ROP processes, 9 review standards for power uprate, early site permits 10 and the construction inspection program. 11 It discussed many of your internal challenges to the 12 staff to improve their effectiveness and efficiency 13 such as roles and responsibilities, centralized work 14 planning, human capital, as well as many of the other 15 crosscutting issues for both external and internal 16 changes from the Davis-Besse Lessons Learned. 17 We are looking forward to hearing your progress in 18 all of these areas. We know that you have new 19 challenges that have occurred over the past year, and 20 probably you have seen some in the horizon. 21 I'm particularly interested in hearing how 22 you intend to bring key issues to closure and how you 5 1 are prepared to address the future. 2 Do my fellow Commissioners have any comments? 3 COMMISSIONER MERRIFIELD: Mr. Chairman, I 4 would say I would agree with the characterization you 5 made about our staff in the region and in 6 headquarters who worked on the Davis-Besse matter was 7 a significant amount of work. And I think the staff 8 very much did distinguish itself in this effort and I 9 think the Commission -- and I'm one of them -10 believes that we are very impressed with the work 11 that has been done and certainly would want to agree 12 with the remarks that you make. 13 CHAIRMAN DIAZ: Thank you, Commissioner 14 Merrifield. And with that, Dr. Travers. 15 DR. TRAVERS: Thanks, Chairman, and good 16 morning. As you pointed out, we are here to discuss 17 with the Commission the reactor safety program and 18 you have also pointed out that NRR has the lead 19 responsibility for that. 20 I was thinking about our meeting yesterday 21 where we were talking about the second year 22 anniversary of Nuclear Security and Incident 6 1 Response. Well, NRR has been around for 28 plus 2 years and still kicking, and we are looking forward 3 to the presentation today. 4 They have a lot of stakeholders internal to 5 the NRC who support them and I'm sure Jim will 6 mention them. But they include just about every 7 office, certainly Research, the Regions, OGC, NSIR 8 themselves, State and Tribal Programs. But 9 basically, all the offices within the agency are, in 10 one way or another, supportive of the activities that 11 Jim has principal responsibility for. 12 With that, let me turn it over to Jim. 13 MR. DYER: Thank you, Dr. Travers. Good 14 morning, Chairman, Commissioners. 15 Today we are here to brief you on our fiscal year 16 2003 accomplishments and the initiatives in progress 17 to meet some of the challenges that we are facing now 18 in 2004. Our first challenge today is to provide you 19 with a lot of information in a very short period of 20 time. 21 To do this, we have tailored our 22 presentations to address the issues that we haven't 7 1 recently discussed with you such as the Davis-Besse 2 Lessons Learned Task Force action items that we 3 recently held a Commission meeting on and those items 4 that we're preparing to brief you on under as part of 5 our agency action review meeting briefings that will 6 be in the coming near future and the coming months. 7 However, we are prepared to answer any of those 8 questions you may have in those areas, as we have 9 staff strategically placed within the audience, and 10 also we have Mr. Caldwell, Jim Caldwell, from Region 11 III here to speak for the regions on the reactor 12 safety programs. 13 May I have the next slide, please, slide 2. 14 We structured the agenda today to address NRR's four 15 major areas of the reactor safety program and then 16 also some current technical issues that are 17 challenging all of these areas. 18 Mr. John Craig will present the 19 accomplishments and initiatives in the first three 20 agenda items: Reactor inspection and assessment, new 21 reactors and license renewal. 22 Then Brian Sheron will discuss the 8 1 accomplishments and the initiatives in the reactor 2 licensing and emerging technical issues areas. 3 Before I turn over the presentation to John, however, 4 I would like to discuss some of our NRR office wide 5 initiatives and to summarize our current fiscal year 6 '04 budget. 7 Slide 3, please. 8 These five initiatives are areas on which 9 NRR must remain focused during all of our regulatory 10 activities. The integration of safety, security and 11 emergency preparedness has become increasingly more 12 important since September 11, 2001. NSIR briefed you 13 yesterday on their extensive reactor security 14 activities. You will hear today on our reactor 15 safety activities. 16 And the security and safety programs cannot 17 become isolated from each other, but must be closely 18 coupled to be effective. 19 NRR and NSIR have been working together to provide 20 this coupling and we are now planning to establish a 21 working group to jointly review each other's 22 activities to be ensure we don't create any 9 1 unintended consequences for the other office during 2 the conduct of our activities. 3 Similarly, the emergency preparedness 4 provides defense-in-depth for both areas in our new nuclear 5 emergency preparedness project office, and intended 6 to integrate this important function across all NRC 7 offices and regions. 8 We must also continue to improve our 9 communications both transmission and receipt of 10 information within NRR, within the NRC and with our 11 external stakeholders. 12 Communication lapses can be identified with 13 all of our regulatory breakdowns as was recently 14 identified in the Davis-Besse Lessons Learned Task 15 Force Report. 16 In NRR, we created two -- we have 17 dedicated -- excuse me. In NRR, we are working to 18 make communications an integral part of our daily 19 work. We have created two positions dedicated to 20 improving both our internal and external 21 communications. 22 We have created a weekly office newsletter, 10 1 increased our inspector communications and conducted 2 specific sessions at the regulatory information 3 conference to address communication improvements and 4 recently conducted a specific management retreat to 5 focus on improving our vertical communications within 6 NRR and up through the Commission offices. 7 We are also continuing our efforts to improve our 8 safety culture. The IG 2002 survey identified 9 several areas that we are focused on, and we recently 10 conducted an informal survey of some of the staff 11 which identified that we have more work to do in 12 these areas. Bill Borchardt, my deputy, has 13 initiated actions with all the divisions to address 14 these issues. 15 One activity that we are undertaking is to 16 develop a nonconcurrence procedure to ensure that we 17 allow employees a constructive manner to raise 18 disagreements at the working level. 19 Human capital remains foremost on our minds. NRR has 20 done an outstanding job of recruiting high quality 21 staff. Sam Collins turned that over to me. 22 Our challenge is now to ensure employees become and 11 1 remain trained for today's needs as well as our 2 future needs. Again, Bill Borchardt, my deputy, has 3 initiated monthly human capital development meetings 4 with all the divisions to address these important 5 issues. 6 Lastly, we continue to focus on improving 7 our cost effectiveness. The NRR work planning center 8 has brought new discipline to the NRR licensing 9 processing and we are expanding it to cover all of 10 our activities. 11 Additionally, we need to get standardize 12 cost reports to all levels of our management team to 13 better address out-of-standard performance and make 14 timely corrections. 15 Slide four, please. With this final office-wide 16 initiative in mind, I would like to briefly summarize 17 our budget for fiscal year '04 and the programs being 18 discussed to date. The emerging issues that we will 19 be discussing are influencing all of these programs. 20 This slide graphically displays the fiscal year 2004 21 resources associated with NRR's major reactor safety 22 programs. 12 1 Specifically, the inspection and assessment 2 activities are approximately $50 million or 39 3 percent of our budget. Reactor licensing activities 4 similarly are $45 million dollars of our budget and 5 reflect about 35 percent of our direct activities. 6 And the new reactor activities are about $19 million 7 or reflect about 15 percent of our activities. 8 License renewal activities are $11 million and 9 reflect about 9 percent of our activities. 10 In addition to this, we have the overhead 11 and travel budgets which are applied evenly cross the 12 overall reactor safety program. And we have a 13 balance of activities which include homeland 14 security, decommissioning, and our international 15 activities throughout the agency. 16 Obviously, what is excluded from this is 17 the efforts that you heard yesterday from the Office 18 of Nuclear Security and Incident Response for 19 improving reactor security and also the research 20 budget which we discussed. 21 With that, let me turn this presentation 22 over now to John Craig to discuss our largest 13 1 budgetary issue, the reactor inspection and 2 assessment activities. John. 3 MR. CRAIG: Good morning. I get to talk 4 about several successes and some challenges with NRR 5 activities this morning. As I go through the 6 accomplishments and then into the initiatives and 7 challenges, I would not want you to get the 8 impression that by focusing on the challenges, we 9 are talking about major problems. We are looking at 10 ways to improve the programs and activity. 11 With that, I will follow up on the remarks that were 12 noted at the beginning about the oversight of 13 Davis-Besse. 14 The Davis-Besse event presented a very 15 formidable challenge to the agency. The reactor 16 oversight program was successful in helping to ensure 17 that we had an even level of inspection across the 18 rest of the fleet of plants by ensuring the defining 19 baseline inspection programs and activities that 20 needed to be accomplished. 21 There had been a number of inspections that 22 had been deferred from 2002 and 2003. We completed 14 1 the 2003 baseline inspection program. 2 We were able to do that as a result of a integrated 3 team effort. As inspection resources were needed in 4 Region I as a result of promotion of a number of 5 resident inspectors, an attrition of inspectors and 6 the challenges at Davis-Besse and Point Beach. 7 Regions II and IV and NRR provided approximately 8 120 staff weeks of inspection to the other regions. 9 We had an additional 40 weeks of inspection provided 10 by contractors. We hired some ex-annuitants, NRC 11 people to support that also. 12 I would note that during a ceremony to 13 recognize NRR staff participation and support, a 14 number of the inspectors, and I think all of the NRR 15 staff, made comments that they believe that being 16 able to go out and provide that inspection support 17 was particularly important to them and they thought 18 it was important for their continued professional 19 development and credibility. So there is a surge 20 capacity there that we are looking to maintain. We 21 view that as a very positive activity. 22 With respect to changes in the Inspection 15 1 Manual Chapter 0350, there were some questions early 2 on as we looked at Davis-Besse as to whether or not a 3 significant plant transient would be adequate to get 4 the plant moved into 0350 coverage. So we revised 5 the manual chapter. This is one of the Davis-Besse 6 Lessons Learned activities that we have accomplished. 7 Talk about the significance determination process and 8 the notebook development. It has been an area of a 9 lot of focus as a result of audits by the Office of the 10 Inspector General, a lot of effort on the part of 11 staff. Between May 2001 and September 2003, 71 SDP 12 notebooks were benchmarked against the associated 13 plants specific PRA models. 14 This was done with a team with support from 15 Brookhaven National Labs, as well as Idaho National 16 Labs, as they went to each site and benchmarked some 17 40 systems, components and operator actions. Pretty 18 significant accomplishment. 19 Next slide. Staying on the theme of 20 significance determination process development. It 21 was clear that the timeliness of completing SDPs was 22 an area where we needed to focus some attention and 16 1 we have done that. With respect to improvements that 2 have been made in SDPs in addition to the notebooks, 3 a number of the tools are continuing to evolve and be 4 developed and issued. 5 SDPs for fire protection, shut down safety 6 and containment performance have been developed and 7 they are being reviewed and commented on right now. 8 New SDPs for steam generator tube integrity, 9 maintenance rule implementation and physical protection 10 are in various stages of development. 11 In December, we forwarded to the Commission 12 a list of old overdue SDPs. There were 17. Today 13 13 of those have been resolved. 14 Of the current inventory, there are 11 that 15 are open, and 6 of those are overdue. Of the six 16 that are currently overdue, four are related to fire 17 protection, one is related to the maintenance rule 18 and one is related to the pressure boundary. 19 So we have made a lot of progress in resolving SDPs, 20 completing the old ones. And with the new tools we 21 will be able to sustain that level of performance. 22 We are going to keep looking at the timeliness of 17 1 SDPs and working with the regions to make sure they 2 are completed in a timely manner. And if we need 3 additional improvements to the tools, we will work 4 those into the process. 5 Performance indicator improvements. 6 Performance indicator is another program that we 7 think successful. There are some areas that we have 8 been working on, and one of those has to do with the 9 timeliness of resolving frequently asked questions. 10 This is a process that involves discussions with the 11 industry to implement and better understand various 12 aspects of implementing performance indicators. 13 But, like a lot of processes, we focused on meeting 14 to discuss but we didn't really think through in the 15 beginning what happens if you can't reach a 16 resolution on one of the questions. 17 So those questions have lingered. 18 Some of them have gotten too old. And I think this 19 is one of the contributors that has resulted in some 20 questions about the PI program and where it is going 21 and what it is doing. 22 We have made some changes to the FAQ process. One of 18 1 those changes is that questions will get discussed at 2 a monthly meeting two times. So it will be two 3 months. And after that, a decision is made. If 4 there are still issues, then it can get elevated to a 5 senior level manager so we can make a prompt decision 6 and move on. So that will eliminate a number of the 7 FAQ's that are ongoing. 8 One particular PI that has been the subject 9 of FAQ's and 9 of the 13 currently open FAQs are 10 related to scram with loss of normal heat sink. This 11 is an interesting performance indicator. It was 12 developed to count complex scrams. And so if you 13 have a scram or you have to shut the main steam 14 isolation valves, for example, and the downstream 15 piping is there, the question is should you count the 16 scram? It depends on how complex it was and what 17 other actions need to be taken. 18 That is an example of one that has resulted 19 in a significant level of discussion and interaction 20 and some confusion. It is one we are going to work 21 on to try and better improve the definition to make 22 the implementation questions whether things count 19 1 more clear, more understandable and move on. What we 2 will not let it do is continue to linger for months 3 and months and months. 4 We are going to continue our effort to 5 improve the Performance Indicator Program. There is 6 a SECY that is due to the Commission, I believe, the 7 end of next week. It's the annual ROP assessment 8 SECY. You are going to see some more discussion in 9 that paper about performance indicators and some of the 10 things to go forward. I think it is a successful program. 11 We will continue to evolve it and make the 12 implementation more effective. I'm going to pause 13 and talk about another PI, potential PI that has been 14 under a pilot program for a while. This is the 15 mitigating system performance index. It was 16 developed with significant support from the Office of 17 Research. They did a great job developing a PI that 18 would be more risk-informed, that would be capable of 19 reflecting site specific PRA information. So there 20 are some benefits there. 21 We piloted that program and the pilots were 22 completed in the fall. And since the fall in 20 1 January, we have been doing an assessment of the 2 benefits of the PI and cost of that performance 3 indicator. 4 In addition to some technical questions 5 about the actual indicator itself, we looked at the 6 resource estimates that would be required to start up 7 over the next two years or so to conduct workshops, 8 conduct training, et cetera. The estimates are high. 9 It is an 25 to 30 FTE per year for 2 years. 10 One of the things of particular concern is 11 that the bulk of the burden to implement that PI 12 would be with the senior reactor analyst in the 13 region. It would be a very significant workload on 14 those as well as some other inspectors. 15 So while there are benefits to that PI on balance, we 16 have concluded that the costs are so high that it is 17 not appropriate to move forward and implement it at 18 this time. We are going to meet with industry this 19 afternoon as part of a monthly meeting to talk about 20 that some more. 21 Engineering inspection improvements is an 22 area that is interesting to a number of us that have 21 1 been involved in engineering inspections in previous 2 lives. The regions have all been looking at it in a 3 number of ways. And as a result of discussion with 4 the Commission and some direction, we are preparing a SECY 5 that is going to discuss an engineering inspection 6 program that will look at risk significant systems, 7 look at systems where there have been modifications, 8 look at components where there might be low design 9 margins and walk through in the SECY a discussion of 10 how we would approach that. 11 Traditionally, you need some pretty sharp 12 consultants, expertise to do these engineering 13 inspections and that's part of the pilot program. 14 One of the reasons to propose this program is that 15 engineering is one of those things that we assume has 16 been done correctly so that the engineering 17 adequately is reflected in as-built, as-is plant. 18 The PRAs that are done and form the basis for safety 19 evaluations and licensee decisions stem from good 20 engineering. 21 So, we have seen plants like Davis-Besse 22 and others that have been shut down for a long time 22 1 identify a number of engineering designs kinds of 2 issues. And we see those occasionally as part of the 3 50-72 reports. 4 We saw one last week where the drain in a 5 room was not sufficient to drain the water if the 6 fire suppression had actuated. So you would have 7 flooding of the safety-related equipment in the room. 8 You see those kind of things from time to time. 9 So the question is, is there is an issue there where 10 we need to change the level of regulatory oversight. 11 We believe the pilots are a way to help define and 12 better answer that question. And we expect that SECY 13 paper to be forwarded to the Commission in just a few 14 weeks. It is well into development right now. 15 Cross-cutting issues are another area in 16 our Inspection Manual Chapter 0305 that we been 17 looking at. And the key is to ensure consistent 18 implementation of cross-cutting issues across the 19 regions. 20 We have made some revisions to better 21 define requirements for plants that have previously 22 had substantive cross-cutting issues and a mid cycle 23 1 assessment. And that manual chapter has been issued 2 and it is out. 3 The operating experience task force 4 recommendations were discussed in a Commission 5 meeting in February. The lessons learned report 6 include a number of recommendations with respect to 7 operating experience. Obviously, it's an activity 8 that affects not just domestic reactors but 9 international reactors as they focus on our 10 operating experience. 11 We had a steering committee that made a 12 report public and presented it to office directors 13 and regional administrators in January. We currently 14 have a team preparing an action plan with specific 15 actions and milestones to implement that. And it's 16 going to be completed next month. 17 Next slide, please. New reactors is an 18 interesting issue because there is a lot of 19 activity and a lot of diversity. It's an area where we 20 have gotten a lot of support and continue to rely on 21 the support from the Office of Research. 22 With respect to early site permits, I believe 24 1 everybody knows this that fall we took that to 2 another level when we got three applications for 3 early site permits. One for North Anna, one for 4 Clinton and one for Dominion. 5 The staff has held environmental scoping 6 meetings, public meetings at each one of those sites. 7 And they have done reviews and their reviews are 8 ongoing. 9 Hearings will be held with respect to each 10 one of those applications using the new Part 2. 11 And absent the identification of an issue that would 12 be defined as a show stopper, which we have not 13 identified yet, the safety evaluation reports are 14 scheduled to be completed in June, August and October 15 of 2005 for those facilities. 16 We have also developed a review standard 17 that will provide guidance and criteria to conduct the 18 early site permit reviews. That will be forwarded 19 for Commission approval and issued later this year. 20 AP1000 design certification reviews. Westinghouse 21 submitted that application in 2002, in March. In 22 June 2003, we issued a draft SER with 174 open items. 25 1 As of March this year, there were 164 of those items 2 that had been addressed. 3 We had an ACRS letter of March that 4 discussed a number of the open items and some that 5 were resolved. March is an interesting month for 6 AP1000. 7 This is a target -- the end of the month is 8 a target for completing the remaining open issues. 9 If this is accomplished, and it looks like it likely 10 will be, and if Westinghouse issues the final design 11 control document by May 31st, we are on schedule for 12 an ACRS meeting in July. And in September of this 13 year, 2004, to issue the SER. 14 We are monitoring the progress here 15 carefully. We have developed some management tools 16 to track each chapter of the SER and where we are in 17 it. We are looking at it weekly. 18 Pre-application reviews. We are having 19 discussions on the Economic Simplified Boiling Water 20 Reactor, the ESBWR. GE requested pre-application 21 review in April 2002, to be done in two phases. They 22 plan to submit additional topical reports which would 26 1 really be a phase 3, and with an expectation that they 2 would submit a design cert application in 2005, mid 3 2005. 4 The Advanced Canadian Reactor, the ACR 700 5 design, we have been requested to do reviews and 6 focus on several key technical issues. The technical 7 issues we are focusing on are reactor pressure 8 boundary, computer codes and validation with respect 9 to thermal hydraulics and the core, and on-line 10 fueling and the confirmation of negative void 11 reactivity. 12 Pre-application review and the SER plan to 13 be completed September of this year, 2004. Design 14 certification may be received as early as the fall, 15 2004. 16 I will move to the draft construction 17 inspection program. The staff published a framework 18 document in 2003 that discusses the various designs 19 and the construction inspection program activities 20 and how we plan to evolve and develop construction 21 inspection program. It has been a while since we 22 have done construction inspections. 27 1 Modern design techniques, modular 2 construction, offshore vendor suppliers, components, 3 raise a number of interesting scheduling and 4 technical challenges for the staff. We are trying to 5 look in a integrated manner at the infrastructure 6 that is going to be necessary to conduct the 7 inspections to support the regulatory decisions that 8 are going to need to be taken to support licensing of 9 an advanced plant. 10 COMMISSIONER MERRIFIELD: Mr. Chairman, if 11 I may interrupt John's presentation just for a 12 moment? This is actually, I think, something that the 13 staff may want to expand on a little bit. I had an 14 opportunity to get a briefing on the construction 15 inspection programs. 16 Given the direction of our licensees, and 17 the methodology that has been adopted abroad, 18 particularly in Japan and to somewhat of a lesser 19 extent in Taiwan, the use of modular construction 20 could envision the use of shipyards here in the 21 United States or abroad where large components would 22 be manufactured and barged in or trucked in and 28 1 brought in to a location. 2 This could be really evolutionary and the 3 approaches that will be required for our staff and 4 our inspectors to go out, whether it is to locations in 5 the U.S. or elsewhere to inspect those sites. 6 I want to make sure the staff is credited. 7 I think they are looking at that very carefully. I 8 think they have been engaging with and will continue 9 to engage with our foreign counterparts who do have 10 some more experience in this area. But it provides a 11 lot of interesting developments for us as an agency 12 and how we deploy our resources to make sure that 13 these reactors, if they are, in fact, ordered and 14 built, are inspected in a way that we can meet our 15 health and safety mission. 16 But there is a lot going on there. And I 17 know they are trying to get through their 18 presentation quickly. But that is one I think is 19 particularly noteworthy. 20 MR. CRAIG: Thank you. There is a lot 21 going on. And it's important to note, as we 22 discussed with the industry, that as they get ready 29 1 to move forward, they are sensitive to the needs that 2 we are going to have with respect to fabrication of 3 components that may come very early in new 4 construction techniques as opposed to one that would 5 have taken place in the past. 6 COMMISSIONER MERRIFIELD: Mr. Chairman, we 7 have a long history of interaction with our 8 counterparts in the nuclear Navy. And the way in 9 which they have to work and inspect, particularly 10 with things such as the carriers down at Newport News 11 may be instructive of the kind of approach we are 12 going to have to think about taking where we may have 13 a lot of components all coming together in such a 14 way. We may actually borrow some of their experience 15 and others as well. 16 CHAIRMAN DIAZ: We have been borrowing from 17 them for a long time. 18 COMMISSIONER MERRIFIELD: We have, but this 19 may be -- it is a good two-way relationship and it's 20 worthy of noting that may be another one where we 21 have to do that. 22 MR. COLLINS: Commissioner Merrifield, 30 1 there is also a shorter term aspect of your point 2 which is a very good one. That is that many 3 components, replacement components for the existing 4 fleet are being manufactured overseas. 5 There is under consideration by the office the vendor 6 inspection program consideration. Which we used to 7 have a program in some form, at one time, very 8 robust. 9 The recent example of that, of course, 10 would be Palo Verde steam generator tube defect which 11 was a construction and a shipping type of 12 consideration. So there is a shorter term aspect 13 even if the longer term deserves more attention. 14 COMMISSIONER MERRIFIELD: For those in the 15 audience who may not realize we can't make steam 16 generators in the United States anymore, along with 17 some other major components. So Sam makes a very 18 good point. 19 20 CHAIRMAN DIAZ: Painfully aware of it. MR. CRAIG: I will follow-up with two other 21 comments. Some of the inspectors that were, in fact, 22 in the vendor inspection program branch have been 31 1 actively involved in this effort. They are visiting 2 Canada as well as countries in Europe to look at the 3 standards that are used to fabricate and qualify 4 equipment. Which I think will be important to 5 support the decisions that we are going to make. 6 With respect to modular construction, the Japanese 7 tried small modules and large modules at several 8 recent sites. And they have informed us that as a 9 result of their experience, they are going to move to 10 have large modules assembled at the site which 11 provides them a lot of efficiencies and the expertise 12 in one spot to put them together, a lot of expertise 13 to do things like receipt inspection, testing. And 14 then, they have a very large crane that picks up a 15 very large module and puts it in the plant. 16 One of the things that they told us was 17 that we can make one large thing in the United 18 States. It's a crane that was made in Detroit which 19 they thought was interesting, recognizing that they 20 were building the new plants. 21 Next slide, please. Some of the ongoing 22 initiatives, the combined licensing preparation -- Part 52 32 1 is a rule that as well as others. And as you read 2 the rule, there are parts that reference other parts 3 of the regulations. And as we looked at the 4 rulemaking and a final rule that was going to the 5 Commission, it became clear that we needed to pause 6 and do a little more thorough look and identify the 7 other parts of the regulations that need to be 8 revised. So that as one part of the regulations 9 point to another part, they are consistent. 10 We are working closely with OGC to do that. And a 11 final rule is tentatively scheduled to be forwarded 12 to the Commission in August, 2004. So that's what we 13 are working to today. 14 It's more one of clarifications. And it is 15 going to include Part 50, 52, 100, et cetra. 16 We are working with NEI on a number of issues where 17 clarification has been requested. And we are working 18 to develop a guide that will discuss items such as 19 format and contents, combined operating license 20 applications. That work is moving along well. And I 21 think that kind of infrastructure will be important 22 reflecting on what we did in license renewal to help 33 1 external stakeholders understand what is expected and 2 what it will take to submit a good application. 3 I will note that DOE has a solicitation out 4 for applicants for combined operating license and 5 part of that information that is required is a 6 selection of a design. 7 We are optimistic that the design selection 8 will give us insights into the kind of designs that 9 we need to be further along on as we try to work 10 various design certifications to support future 11 applications. 12 We talked a little bit about the construction 13 inspection program. And I think that we covered it. 14 So I am not going to add anything there. The intent 15 here for the initiatives was to talk about the 16 challenges and how we are going to meet those 17 challenges. And I think we are doing that. 18 There is some uncertainty with respect to 19 transitioning from pre-application to a design cert 20 application and when licensees would submit the design 21 cert applications. Dealing with that uncertainty and 22 scheduling resources and reviews is something we are 34 1 very sensitive to. 2 Both the ESBWR and ACR 700, as I said 3 before, are planning to come in for design cert, and 4 based on the experience from the AP1000 and the 5 novelty, the differences with these designs, it is 6 likely they are going to require significantly more 7 resources for the staff reviews. So we are going to 8 look at those very carefully and we are sensitive to 9 that. 10 I will note the current estimates for 11 design cert for these plants is between four and five 12 years. There are six other designs, additional 13 pre-application reviews. And I will run through 14 these. This is another area where we are getting a 15 lot of support from Research. 16 The Simplified Water Reactor 1000, it is a 17 German boiling water reactor, Framatome is the 18 sponsor of that. They have not announced whether or 19 not to pursue a decision for pre-applications 20 interactions with the staff yet. 21 The Gaseous Turbine Modular High 22 Temperature Reactor is a General Atomics effort. 35 1 There is virtually no activity ongoing with that 2 right now. Pebble Bed Modular Design requested 3 pre-application activities beginning late this year. 4 The International Reactor Innovative and Secure 5 Design, the Westinghouse design, has expressed 6 some interest in pre-application activities and we 7 anticipate a formal request following completion of 8 the AP1000. 9 I will note that there have been some 10 discussions. And it appears that one desire of this 11 new design would be potential reductions of the 12 emergency planning zone. So I have a lot of interest 13 in review. 14 Small Liquid Metal Reactor. That has been 15 discussed. That is a Toshiba design. There have 16 been some discussions about putting one of those in 17 remote parts of Alaska. 18 And then there is the very High Temperature 19 Gas Reactor that is the next generation concept. And 20 DOE has discussed the potential for constructing one 21 of these in Idaho to demonstrate the hydrogen and 22 electrical generation. 36 1 Next slide, please. License renewal 2 continues to be a success story for the agency. I 3 will note that of the 28 units that have announced 4 license renewal application dates between 2004 and 5 2009, combined with the ones in-house or completed, 6 it accounts for about 70 of the units in the United 7 States will have sought. And it looks like absent 8 technical issues that cannot get resolved, it is 9 likely that 70 of them will get renewed. 10 We are piloting a new review process. And 11 the new review process involves going out to the site 12 early on to look at aging management programs. 13 In the past, we get the application, read it and send 14 a request for additional information. Preparing the 15 RAI, sending it out, having phone conversations, 16 understand what the question is the staff thought 17 it was asking -- a lot of the communication 18 challenges are overcome by face-to-face discussion 19 and looking at the maintenance program, looking at 20 the aging management programs in place at the plant. 21 We have three pilot plants that we have 22 gone out and done these site audits with, Farley, 37 1 ANO-2 and Cook. Those reviews are ongoing. But it 2 appears that up front we are cutting two months out 3 of the 22-month schedule for each one of those 4 plants. So we are optimistic about that continued 5 savings, and we think that will give us some 6 flexibility to deal with license renewal issues as we 7 move forward. 8 We have updated -- we are updating a number 9 of guidance documents. It has been three years since 10 we issued the guidance documents. We are continuing 11 to work to update the generic aging lessons learned 12 and standard review plan. And we are working with 13 industry toward endorsing NEI 9510 Rev. 4 as part of 14 the continued evolution of license renewal guidance 15 documents. 16 And one of the things that we heard within 17 the last week or so was that the industry is 18 interested in further revision of the generic aging 19 lessons learned. It identifies those aging 20 management programs that we found acceptable. They 21 want to review it to make sure that all the ones that 22 we found acceptable for individual plants would be 38 1 included there and would be a more concise, easier to 2 use tool. 3 The bullet for the application submittal 4 schedule, I covered that briefly with the indication 5 between now and 2009 we will have 70. They are 6 currently in-house 11 reviews underway. 7 We have received letters from the ACRS for 8 two over the last two weeks, and they are positive letters. And as 9 I -- before I turn it over to Brian, I will note it 10 continues to be a very successful program. Thank 11 you. Brian. 12 DR. SHERON: Slide 11, please. 13 I am going to talk quickly about the reactors 14 licensing program, our key accomplishments. We 15 completed 1,774 licensing actions last year in 16 FY '03, 500 of the licensing actions. And we met our 17 timeliness goal. Our inventory was above our goal of 18 1,000. But we basically met all the high priority 19 needs of our licensees. So this was not any kind of 20 a problem. 21 With regard to the access authorization 22 order close out, as of January 7th of this year, all 39 1 licensee responses have been reviewed, found 2 acceptable and we have closed these out. 3 We issued a review standard for extended 4 power uprates, RS-001. Our review standard is a 5 relatively new document. What it does is 6 incorporates the relevant standard review plan 7 sections that apply to uprates and extended power 8 uprate. It also contains additional review guidance 9 that is unique to uprates that reviewers need to 10 consider that may not be included in the current SRP. 11 What this does is it provides very clear guidance not 12 only for the staff but also for licensees on what our 13 requirements are and what the expectations are for 14 their submittals. And this provides for a much more 15 efficient review process and much more predictable 16 one. 17 Next slide, please. 18 Key initiatives. We have a security plan review team 19 established. As NSIR described yesterday, I'm not 20 going into detail about that, but I want to point out 21 that we have provided eight dedicated staff to 22 support this, five technical reviewers, two licensing 40 1 assistants and one administrative assistant. They 2 will be working full time starting in, I believe, 3 towards the end of April to complete these. And that 4 we are taking our responsibility for assuring the 5 safety, security interface very seriously on this. 6 With regard to MOX licensing activities, as you know, 7 Catawba is proposing to put four lead test 8 assemblies into the -- Duke is preparing to put four 9 lead test assemblies into the Catawba reactor. We 10 are planning to have our safety evaluation issued by 11 the end of March. We have scheduled ACRS briefings 12 on this and we plan to issue our amendment by 13 September. 14 The standard review plant update. This is 15 a very major effort since there are over 260 16 sections, individual sections within the SRP. And I 17 want to point out this has been an area that we have 18 been concerned about because we have had to defer 19 these updates in the past for higher priority work 20 every year. We would budget it and then it would not 21 get funded sufficiently. 22 We do have an SRM from the Commission to look at what 41 1 it would take to update the SRP. We are planning 2 to provide that to the Commission by May 3rd and we 3 are developing right now the resource estimates and 4 what we think we can accomplish. 5 Topical report reviews. The inventory right now 6 stands at about 100 topicals that are in-house for 7 review. We have tried to implement or we are 8 implementing new process and improved process in this 9 fiscal year. 10 What this does is it increases the 11 acceptance review time to 45 days. But in that 12 45-day period, what we do is we establish mutually 13 agreeable schedules with the submitter with regard to 14 when the staff is expected to issue RAI's, when we 15 would expect the submitter to respond to those RAI's. 16 We also do a proprietary review to make sure that if 17 the information is claimed to be proprietary, it 18 meets the criteria. And importantly also is a fee 19 waiver review. 20 We have had situations in the past where 21 there has been mis-communication and some submitters 22 have believed that the topical should have been fee 42 1 waived and we did not agree. And we had already 2 started review. 3 So now, we are going to resolve that issue and make 4 sure that both parties understand whether or not the 5 topical is fee waived before we start the review. 6 The rulemaking process improvements. We have 7 implemented the recommendations from the rulemaking 8 improvement task force which includes standardizing our 9 budgeting for rulemaking, standardizing management 10 and tracking process for that. And our challenge is 11 going to be to continue these initiatives and to 12 implement these process improvements as we move 13 forward with the rulemakings. 14 Next slide, please. I'm going to talk now 15 quickly about some current technical issues that the 16 staff is working on. 17 Grid reliability. We have established an 18 internal task force to look at lessons learned from 19 the August 14th blackout event on the east coast. 20 The plan is to review our regulations, our rules, to 21 decide if any changes need to be made as a result of 22 what we learned from the August 14th event, 43 1 particularly, like, for example, station blackout 2 rule or any other requirements. 3 We have also had information exchange 4 meetings recently with both FERC, Federal Energy 5 Regulatory Commission and NERC, the Northeast 6 Reliability Council, to exchange information in terms 7 of what we do and what their roles are. And it's 8 basically, we are looking now to determine if any 9 regulatory action is needed to assure the plants will 10 be able to meet their responsibilities to operate 11 safely over the summer months when the grid is 12 probably strained the most. 13 Power uprate issues. We are seeing 14 component structural degradation in some plants, 15 particularly the boiling water reactors. We believe 16 this is a result of increased steam flows associated 17 with power uprates. 18 This degradation has been in the form of 19 cracking of steam drier components in the welds, 20 cracking of feed water probes that are in the flow 21 path and the feed water lines and also some valve 22 sub-components due to vibration. 44 1 The industry through the boiling water 2 reactor owners group has charged the BWRVIP, which is 3 the BWR vessel internals program group, to address 4 this issue. This include their developing inspection 5 and evaluation guidelines. We have had several 6 meetings with them. 7 We believe right now that they are taking 8 this seriously and they are moving forward in a 9 pro-active fashion. So at this time, we are just 10 monitoring their work and also evaluating operating 11 experience to see if any of the regulatory actions 12 are needed at this time. 13 We are also looking at whether any specific 14 regulatory action is needed at plants that have 15 repeatedly experienced this degradation and 16 particularly the Quad Cities units. So that is an 17 ongoing effort. 18 On containment -- I'm sorry, I don't want 19 to get off the material degradation. We are also 20 working on pressurizer heater sleeve cracking, which 21 was -- this is something that axial cracks have been 22 discovered at CE plants for sometime. This is not 45 1 new information. 2 However, recently, at the Palo Verde plant, 3 they found a circumferential component. Fortunately, 4 it was behind the weld, basically, in a non-pressure 5 boundary portion of the sleeve and didn't pose any 6 challenge. But certainly raised the question about 7 whether circumferential cracking in the pressure 8 boundary portion was feasible. 9 The industry has an initiative. They 10 issued a letter to all their licensees, I believe, to 11 do examinations of these components. And the staff 12 is in the process right now of preparing a bulletin 13 to go out to the licensees requesting information on 14 their inspection plans. 15 With regard to the vessel head order that 16 was issued about a year ago, we recently issued a 17 revision to that order. This was EA 03-009. This 18 incorporated some alternatives to the original order. 19 They were primarily -- we were basically putting in 20 place items that we had previously approved -- you 21 know, alternatives that the licensees had come in and 22 asked for. And these basically were more areas that 46 1 helped them with their inspections. They did not 2 reduce the amount of inspection that was done or 3 anything that would relate to safety. But it does 4 make the inspections a little more, I would say, 5 easier for them to perform. 6 On Bulletin 2003-02, if you recall that was 7 a bulletin we issued on lower head vessel 8 penetrations, and it was issued in response to the 9 leakage that was found at the South Texas plant. We 10 have received the responses to those bulletins. 11 The industry has taken initiative to have all 12 licensees' pressurized water reactors with lower head 13 penetrations to do bare metal visual inspections on 14 their lower heads. To date, none of these 15 inspections have shown any other leakage from other 16 plants. 17 And at this time, we don't see any further 18 regulatory action is needed above and beyond what the 19 industry is doing. However, we will continue to 20 monitor this. 21 On containment sump issues. We continued 22 to plan to issue a generic letter in August of this 47 1 year. I was just told that the draft generic letter 2 will go out for public comment that's been sent over 3 to the administrative office of Administration for 4 processing to put out in the Federal Register. So 5 that should go out within days, I would hope. 6 We continue to work with the industry. There is a 7 meeting going on right now as we speak with the 8 industry to work through the evaluation guidelines 9 necessary to evaluate the sumps when the generic 10 letter goes out. 11 Our overall plan right now is that the 12 industry will complete these evaluations based on the 13 requests of the generic letter by the spring of 2005. 14 And at that time they will either tell us whether 15 their sumps remain operable or whether they have to 16 make any modifications and what schedule they will 17 propose to do those modifications on. 18 In the area of fire protection. NFPA 805, 19 this should be to the Commission shortly. 20 Implementation guidance is on track for June of this 21 year. An inspection guidance will be prepared and 22 available right after the implementation guidance is 48 1 completed. 2 On the manual action rulemaking, the staff 3 is proposing changes to Appendix R to allow manual 4 actions, if justified, in lieu of fire barriers that 5 had been removed. On November 26, 2003, the staff 6 published draft criteria for determining the 7 effectiveness of manual actions to achieve post fire 8 safe shutdown. 9 We did receive a large number of comments. 10 We are also working with NSIR on the security 11 interface with this rule. And our plan is to 12 complete the rule probably by FY '05. 13 Regarding associated circuits. This is a 14 good area or good example of where we have had, I 15 think, good interaction with the industry. We did 16 have a disagreement with the industry regarding the 17 associated circuit issue. This has to do with 18 fire-induced shorts in circuits. 19 To resolve the issue, the industry took the 20 initiative. They performed some tests and provided 21 us information on their assessment. 22 We are using these test results to draft the RIS on 49 1 inspector guidance that will focus on what inspectors 2 are going to be inspecting. In other words, for the 3 most likely spurious actions. 4 Licensees will be expected to prepare and 5 self-evaluate their programs. And then, we plan to 6 resume our inspections, probably, by the end of the 7 year on the associated circuits. So this is moving 8 towards resolution. 9 In the area of risk information -- I want 10 to make sure I'm on the right slide. I'm on slide 11 13. On risk-informed regulation, a number of 12 activities going on there. We are working on the SRM 13 with regard to the stabilization of quality 14 expectations. We have an inner office working group 15 primarily, NRR and Research. But we have also 16 invited the regions and NMSS to participate on this. 17 And the plan is that we would get a plan to have to 18 move forward on the stabilization process by July of 19 this year. 20 Risk-informed special treatment requirements. This 21 is 10 CFR 50.69. We had the proposed rulemaking go 22 out on May 16, 2003. We received 26 sets of 50 1 comments, hundreds of individual comments were 2 imbedded within those 26 sets. So there are a fair 3 number of comments that we need to work through. 4 We are currently working through them, reviewing 5 them, deciding if any changes are needed. But we 6 expect to issue the final rule before the end of the 7 year. 8 On Option 3, the risk informing of the 9 technical requirements, the staff has been working on 10 risk-informing 10 CFR 50.46. On March 3rd, we issued 11 SECY-04-0037 requesting Commission direction and 12 guidance on some of the key policy issues. And right 13 now we are awaiting guidance on that. 14 The last item I wanted to talk about was 15 risk-management technical specifications. And the 16 only thing I wanted to say is that this is an 17 initiative we have with the industry. 18 We are continuing to develop risk-informed 19 improvements to the current system of tech specs. 20 And right now there are eight initiatives that we are 21 working on with the industry. They are in various 22 stages of development but they are all progressing 51 1 well. With that, I think I will turn it back over to 2 Jim. 3 MR. DYER: Thank you, Brian. 4 I just note on the 50.46 effort, we are waiting the 5 Commission direction but we are continuing to work. 6 I know Research is putting together their large 7 break LOCA frequency paper and we have been working 8 with them on preparing that for the Commission. 9 Chairman, Commissioners, I guess I warned you up 10 front in my opening remarks that we were going to try 11 to cover a lot of information in a short period of 12 time. I think I stayed true to form there. We went 13 through a lot of information in a very short time. 14 I hope you heard that we are working to enhance 15 reactor safety in a manner that ensures realistic 16 conservatism. In other words, do what's right. 17 We will continue to work with our internal and 18 external stakeholders to improve our program 19 effectiveness. And my target is through 20 infrastructure development. Essentially, we can't 21 work harder. We have to work smarter. I view that 22 as the way to ensure our success. 52 1 As one of the things I hope you also heard 2 throughout our presentation is reactor safety, 3 achieving reactor safety is certainly a team effort. 4 And you heard it is not only the NRR program here but 5 we have a lead in a number of areas but are supported 6 and we have an active interface by the regions and by 7 the Office of Research and certainly, our 8 coordination with the Office of Nuclear Security and 9 Incident Response. 10 As well as I hope you heard also the heavy 11 reliance and the working relationship we have with 12 our external stakeholders, in particular a lot of 13 the industry groups where the industry has taken the 14 lead for resolving the current technical issues. And 15 we are looking to keep them out ahead of us where we can 16 endorse their standards and their activities and do 17 our own independent review. 18 In this manner, we hope to continue by 19 improving our infrastructure and improve the 20 continuous improvement of our processes and 21 development of our human capital assets within the 22 office of NRR. 53 1 And with that, that concludes my presentation. I 2 will turn the presentation back. 3 DR. TRAVERS: Thanks, Jim. 4 In closing, Chairman, I will just make mention of one 5 quick thing. One way we typically get some insight 6 into our performance is what our external 7 stakeholders think of it. I recently had the 8 opportunity to represent you and the Commission 9 before a Subcommittee of the Senate, including 10 Senators Alexander, Domenici, Craig, and Landrieu. 11 And their particular interest at this hearing was in 12 our programs related to license renewal, power 13 uprates, preparations for the possibility of new 14 power plant licensing activity and on the Browns 15 Ferry recovery activities. 16 And I was struck by the very positive 17 comments that we received as a function of the views 18 that were expressed by the Senators on both their 19 view that our focus on safety is appropriate and 20 their view that we have over the recent years 21 particularly made advances in our effectiveness and 22 efficiency in processing important licensing 54 1 activities within the Commission. 2 So overall, it was a good indication, I thought, if 3 just one of some of the views that important 4 stakeholders on the Hill have of our recent 5 performance. Thank you. 6 CHAIRMAN DIAZ: Thank you Mr. Travers, Jim, 7 John, Sam and Brian. Jim, you were really quiet. 8 MR. DYER: He gets to answer all the 9 questions. 10 CHAIRMAN DIAZ: You have a referral system. 11 I appreciate the briefing. I agree that we made some 12 significant progress in the past few years. And I 13 believe Commissioner Merrifield is going to go first. 14 COMMISSIONER MERRIFIELD: Thank you, 15 Mr. Chairman. I would concur with your 16 characterization that we made a lot of progress. I 17 think that is absolutely the case. 18 I have got a number of areas that I want to 19 try to cover this morning in my questions. It may 20 well be, Mr. Chairman, that as Mr. Mcgaffigan has 21 asked every once in a while, I may want to think 22 about perhaps taking my first whack. And then 55 1 depending on what the two of you ask, maybe take a 2 few more at the end. 3 In the materials that you provided to the 4 Commission that were not part of the public slides, 5 it noted in some detail the fact that we put 163 6 weeks of inspection support to Region I and Region II 7 in order to meet baseline -- I'm sorry -- I and III 8 in order to meet the baseline inspection program in 9 2003. And that was obviously as a result of a lot of 10 assistance from headquarters and from other regions. 11 That was as a result of ongoing issues that 12 those regions were dealing with and something I think 13 none of us would like to see again in the future. 14 My understanding is that we have taken an initiative 15 to hire additional inspectors to help us bridge some 16 of these gaps, particularly looking forward to the 17 years 2004 and 2006. Right now, we are halfway 18 through 2004. And I wanted to get some sense of how 19 are we in our effort to bring on additional 20 inspectors and help us bridge and make sure we have 21 the right resources to accomplish our baseline 22 program for this year and beyond? 56 1 MR. DYER: I will start off from an overview and turn 2 it over to Jim Caldwell to talk about any of the 3 regional specifics. But I think working with the 4 Office of Human Resources, the headquarters staff as 5 well as the regional staffs, have done just a superb 6 job of recruiting and putting people through a 7 training program to get inspectors out. 8 I think John had some statistics as to 9 where we are right now on the site coverage activity 10 from the inspectors. But it is improving from where 11 we have been in the past. 12 So we are working on improving our 13 inspector assets. The concept that changed recently 14 that I think is important is when we increased our 15 FTE by 13 to cover this additional inspection, was 16 with the recognition that deployed the FTE to all 17 four regions with an understanding that they are 18 going to be tasked to support wherever the emerging 19 issue is. 20 And so, in the past we would try to target 21 and follow which regions is going to have the 22 problem. And we would allocate the resources. But 57 1 by the time the resources got allocated and trained 2 and hired, the issue may have shifted to a different 3 region. So we were continually chasing the issue. 4 John, do you have the specifics? 5 MR. CRAIG: I think that coupled with if 6 you know that a resident is going to leave the site, 7 you can deploy an inspector there 12 months ahead of 8 time. A senior resident, you would deploy the 9 replacement six months ahead of time, which provides 10 a greater overlap. 11 We did a quick pulse of the regions and I 12 can say that every site has a basic complement of 13 inspectors that have completed basic quals. 14 So it is in a good place today and I think it is 15 getting better. 16 MR. COLLINS: Commissioner, I think we have 17 in a programmatic sense at the deputy EDO and EDO 18 level, the expectation is that we will share 19 resources as a team to accomplish the agency's 20 mission. Clearly, your point is that we don't want 21 to have to deal with an acute situation. And 22 historically, we have had to do that. 58 1 The budgeting in the go forward sense provides for 2 the pool of resources. And to the extent that we 3 acknowledge that, there is an addition to the 4 regional administrator's performance plans, which 5 acknowledge that we will share resources as a team to 6 ensure that the agency's goals are met. 7 That breaks down the barriers region to 8 region and office to office to ensure that on a 9 priority sense, knowing that we have to add/shed 10 activities, we will go to the most important 11 priority, share resources, to accomplish that goal. 12 COMMISSIONER MERRIFIELD: But the bottom 13 line of my question is that you were on the 14 trajectory we expect to be on in terms of hiring and 15 that in addition to other management changes, we will 16 be able to do what we need to do with our baseline 17 inspection program? 18 19 MR. CRAIG: Yes, sir. COMMISSIONER MERRIFIELD: Okay. On slide 20 six in terms of talking about key initiatives, one of 21 the issues you outlined was performance indicator 22 improvements program. This is, obviously, a key 59 1 facet of our reactor oversight process. I'm getting 2 some sense -- and it may have been in the background 3 slides -- that there may be some additional 4 assessment of these that the staff may be 5 considering. 6 I was wondering if you could outline for me 7 a little bit where this is going and what the 8 rational is for it? What resources might be 9 associated with it if you are going down that line? 10 11 MR. DYER: I would defer that to John. MR. CRAIG: Every year we do an annual 12 assessment of the oversight program, looking into 13 PIs, looking at the findings as part of that SECY. 14 And every year, we go from a top to a bottom to look 15 at what the experiences have been, what have we 16 learned, what changes should we consider. 17 And that's what we are doing as part of the 18 annual review. The two PIs that I talked about are 19 the ones of focus. I think that those are pretty 20 much old news. We have known about those for a 21 while. So, the thrust is the normal review and it 22 gets discussed in greater detail in the SECY you are 60 1 going to get next week. We are not conducting 2 anything out of the ordinary or routine associated 3 with PIs in general. 4 COMMISSIONER MERRIFIELD: That's good to 5 hear. I was not certain what I was reading from the 6 slides. I just wanted to make sure I got that 7 understanding. 8 I think from my own standpoint that 9 performance indicators is -- you know, that program 10 we have had in line, in one form or another, going on 11 five years from now. I think it is a tool in our 12 program that has worked for us well. 13 Now, is it a panacea? And I think no one 14 even entering into this would have said that. Or at 15 least, no one should have taken the indication that 16 performance indicators are in any way a panacea. 17 I have used the analogy before, my family coming from 18 a hardware background. You have a tool box filled with 19 different tools. Each of them serves a purpose. And 20 not one tool is the basis for all that you do. I know there 21 may be a few folks out there who perhaps don't like 22 the performance indicators as much. But I think that 61 1 they have been very effective in helping us achieve 2 some elements of our program. Obviously, there are 3 others. We are looking at engineering inspections. 4 We are looking at how we do inspections online. And 5 there is a whole variety of things we need to do and 6 continue to do to make sure that we are appropriately 7 supervising and analyzing our licensees. 8 But I just wanted to make sure that we were all on 9 the same wavelength on that one. 10 I had an opportunity during my presentation 11 at the RIC to talk about fire protection. And one of 12 the slides that I put up was the notion that in the 13 year 2000, I had noted that we really needed to come 14 to conclusion in terms of wrapping up where we were 15 going on fire protection. 16 I put up the very same slide at this RIC, 17 noting that we still need to wrap up where we are in 18 fire protection, four years hence. 19 Now, obviously, we need to do the right 20 thing. Speed is not our only criteria. We need to 21 make sure we are doing something that is right. But 22 at the same time, many of our stakeholders, be they 62 1 the regulated industries or individuals who watch 2 what we do, be they on Capitol Hill or in the other 3 stakeholder communities, I think everyone is at a 4 point now where can we come to a resolution on fire 5 protection. 6 And it certainly would be my hope that we can do 7 that. And perhaps you can go into a little greater 8 detail about how we are going to get that and where 9 we are. 10 MR. DYER: I will pass that baton to Brian. 11 But just let me say, Commissioner, my hope, too, as a 12 former regional administrator, is trying to deal with 13 a lot of the open fire protection significance 14 determination process issues and some of the effort 15 that has to go into it and prolonged activities. 16 It's an area that I'm interested in going to closure 17 on, certainly. 18 One of the areas that we have talked about 19 and it has somewhat slowed our views is, of course, 20 the integration of security and safety. We 21 originally had a game plan for fire protection that 22 was just based on safety. 63 1 Now, we are considering, particularly with the 2 rapidly evolving issues in the security area, many 3 that you talked about yesterday in the closed meeting 4 as well as alluded to in the open meeting, is 5 making sure -- this is one where we make sure we 6 don't do something in the safety arena that is going 7 to later, with respect to safety and security 8 interface, that we will have to reconsider. 9 So we are taking a pause to make sure we are going to 10 have an integrated approach on that. But Brian can 11 give you much more. 12 DR. SHERON: I'm not sure I can give much 13 more but, we have -- obviously, I been concerned and 14 I think Susie Black has been concerned also about 15 trying to reach some sort of closure on the fire 16 protection issues. 17 I am going to be as candid as I can based 18 on my experience working in this area now for a 19 number of years is that there could be new issues 20 that are going to arise. And I think it is just a 21 little bit the nature of the beast. Plants that were 22 designed a long time ago when Appendix R was 64 1 promulgated, there was a lot of improvements that had 2 to be made. What we found out is inspectors go out 3 is that they may not see something the first time and 4 they catch it several times, maybe a couple of 5 inspections later. The licensee says, well, you 6 approved this because you were out here, and 7 inspected this and I got a good inspection report or 8 something. 9 We have to deal with those. Sometimes on a 10 case-by-case basis, other times they have become more 11 generic. And we try to deal with them on a generic 12 basis. 13 We hope that the number of these issues is 14 starting to narrow down and the like. I think in my 15 presentation I tried to touch on the main ones. And 16 I hope I left you with the impression that these are 17 all on a success path as far as I can tell. We are 18 hoping NFPA 805 which provides a risk-informed 19 alternative, licensees will adopt this. And 20 hopefully, that will get us out of some of these 21 difficult situations with, you know, what's the real 22 licensing basis and so forth, and what does the 65 1 regulation mean and the like. 2 3 With manual actions, that was one that -MR. COLLINS: Why don't we have Susie talk 4 about the closure process. I think that's the real 5 thrust of the question, rather than the specific 6 technical issues. 7 8 DR. SHERON: Okay. MS. BLACK: Thank you. I think what Brian 9 was saying is that -- I have a little pollen issue 10 today. The closure plan is really to continue these 11 rulemaking processes and get them on the books so 12 that licensees can pick up 805 or through the manual 13 action rulemaking, resolve their issues with the 14 outstanding inspection findings we have in that area 15 as well as the circuit analysis. 16 Circuit analysis, we have recently issued 17 a RIS. It provides guidance for not only licensees 18 but for our inspectors to understand what are the 19 most risk significant and most likely circuit 20 problems that will be identified and fix those. 21 22 COMMISSIONER MERRIFIELD: Timing? MS. BLACK: Timing. The 805. That rule will be 66 1 up to the Commission by a month from now at the latest. 2 CHAIRMAN DIAZ: Closure of this issue was 3 first addressed by me, I think, six years ago. I was 4 a young man then. 5 MS. BLACK: Yes, I was a young person as 6 well, six years ago. 7 CHAIRMAN DIAZ: I believe what Commissioner 8 Merrifield and I are saying, and I'm sure 9 Commissioner McGaffigan could add his own views, but 10 I'm sure they are not different; is that we need to 11 take this to the point that we can say this is 12 closed. And it goes from the inspections. It goes 13 to the rulemaking. 14 But, really, this is an area that has been 15 lingering in here. I know it is difficult. I don't 16 want to make it simpler. I would like just to see 17 it closed. And I think it is getting to that point 18 in which we need to put whatever resources and tell the 19 industry that this area has to be closed. That we 20 cannot be going back and forth, back and forth. 21 MS. BLACK: We have been working very well 22 with the industry. We have a working group where we 67 1 meet triannually. And when the identified issues 2 come up, we work together to determine what are the 3 most important and what is the proper closure plan 4 for each issue. 5 I think with the completion of the first 6 round of the triannuals, I think we have found most 7 of the issues that were out there. And we have paths 8 for closure for all of those issues currently. 9 10 CHAIRMAN DIAZ: Just do it. Thank you. COMMISSIONER MERRIFIELD: Next question is 11 grid reliability. You mentioned a little bit -12 obviously, there has been an ongoing issue associated 13 with the Chairman's involvement in the task force, 14 Secretary Abraham's task force in the phase one and 15 two recommendations. That is an effort. 16 We have our own internal look that we need to do on 17 looking at grid issues. Our staff has made some -18 there is some discussion, I know in the staff, of 19 different things we need to take a look at. 20 Today is I think is March 24th. We know that there 21 is a key summertime period that we have to be 22 concerned with. 68 1 What is the timing and what kind of specific action 2 do you think we may have that will be coming to the 3 Commission so that we can act in ways, if we need to 4 act, prior to a summertime period, we will be in a 5 position to do so? 6 DR. SHERON: The plan right now is that we 7 intend to issue a RIS, regulatory information 8 summarily, to the industry. This will basically set 9 forth what our expectations are with regard to their 10 responsibilities for a sure and safe plant operation 11 during the summer, which could include, you know, 12 monitoring the grid and so forth. 13 We are also now looking at, once we get the 14 RIS out -- which we hope will be shortly. And I am 15 guessing maybe within a month or so, but before the 16 summer months. 17 The next step is that staff has been 18 instructed to look whether we need to gather any 19 further information from the industry through, for 20 example, a 50.54(f) request. That is being evaluated. 21 And they are supposed to come back to our management 22 team with a recommendation on whether we need to 69 1 gather more information. 2 In which case, then probably later in the 3 year, a 50.54(f) request might go out to the industry. 4 We also, in addition to the RIS. are preparing a TI, 5 temporary instruction. And we will have our 6 inspectors go out and follow-up with the licensees 7 with regard to their preparations and so forth for 8 operating reliably over the summer. 9 MR. DYER: We have, I think, a Commission 10 meeting scheduled for May to provide the Commission a 11 detailed briefing on the grid reliability issues. 12 But as Brian said, we were focused on what was our 13 immediate action to support this summer. And we were 14 debating do we needed to go out with some sort of a 15 bulletin or request information back before the 16 summer or do we believe that the current situation is 17 adequately covered. 18 And where the staff came out was that our 19 current regulations, in particularly the maintenance 20 rule, A4 Rule, requires that licensees take the 21 appropriate -- that manage the risk when they are 22 taking systems out of service for maintenance. 70 1 The information notice is going to reiterate that 2 point, that grid reliability, the condition of the 3 grid and monitoring it is a key factor that you have 4 to consider in these activities. 5 I believe that should be a -- most licensees do that 6 but we are concerned about taking diesels out for a 7 extended period of time with the grid situation. 8 The issue on the bulletin from my perspective is one 9 of can we accurately monitor the grid? What are the 10 mechanisms for monitoring the grid? And we recently 11 had an event, I think at the Calloway Station, where 12 they were monitoring the grid but the grid was 13 unstable and they could not tell because of the 14 current situation. 15 So that is an area that technology is 16 evolving. As we said, we are meeting with NERC and 17 many of the transmission organizations, and as part 18 of the TI is looking at it to understand what is the 19 optimal way or what's the best way of monitoring the 20 grid so that you have a good understanding of your 21 grid around the plant. And that is sort of a 22 differentiation between the two steps that we are 71 1 talking about. 2 COMMISSIONER MERRIFIELD: Given the timing 3 of this -- and I think we should go ahead and have 4 the meeting in May. It may well be that in the 5 interim, rather than holding off with some of the 6 information, at least from my perspective -- I know 7 the Chairman has been very involved in this and there 8 is interest with all of us, there may be a need 9 either through our TAs or directly to give us some 10 interim information so we can maintain, at least from 11 my sense, maintain an understanding of what is going 12 on. And not necessarily wait until the May time 13 period to give all of that to us. 14 MR. COLLINS: Commissioner Merrifield, there will be a 15 driver for that and that is the national report and 16 including the Canadian portion, which makes it an 17 international report, on the August 14th event is 18 scheduled to be issued this coming Monday. Of 19 course, the Chairman plays as major role in that as 20 working group co-chairman. There are a number of -21 COMMISSIONER MERRIFIELD: That's a partial 22 driver. But we have to do what we have to do as a 72 1 regulatory agency. That is an important effort that 2 you and the Chairman have been very involved with. 3 We have got to take our own internalized assessment. 4 I would note that as well. 5 MR. COLLINS: That's true. In fact, that will come to 6 closure as a part of the report. The report has a 7 number of recommendations which are going to rely on 8 NRC involvement and the interfaces between FERC and 9 NERC and DOE and others. And there is a proposal to 10 continue that interface in the next year which would 11 include our role and bringing to the table our 12 concerns in order to address those interfaces. 13 It turns out there is discussion in this 14 report about the role of large base load plants, 15 particularly some large base load nuclear power plants which 16 are in critical grid sectors which although are 17 operating safely and shut down safely would have a 18 tendency to drive the performance of the grid were 19 they were to be on line or off line in some of these 20 places. 21 CHAIRMAN DIAZ: I believe we have both efforts 22 going on in parallel. And both 73 1 are coming to the point that we need to be able to 2 put them together. I think we are getting there. 3 That's my impression from my discussions. 4 COMMISSIONER MERRIFIELD: Mr. Chairman, I 5 may well have a couple of additional questions at the 6 end. 7 CHAIRMAN DIAZ: Sure. We are talking about 8 grid reliability. Of course, that is of interest 9 not only to us, but it seems like the issue of grid 10 reliability and the importance of what is called 11 extreme events, whether it be a heat wave or a major 12 storm is now coming around as not only a national 13 issue but an international issue. 14 So I think capturing what we need to do in 15 the summer early has some significance for the United 16 States and for the North American grid. But it is 17 also an issue that our international colleagues have 18 serious concerns about it and what kind of actions do 19 we take. So it is really deserves our attention. 20 Let me go to some of the issues. John, you were 21 talking about some of the construction. I notice 22 that on the slide 7, the draft construction 74 1 inspection program is listed as an accomplishment. 2 And then on the slide 8, you name it as a key 3 initiative. 4 So, I know the difference between draft and 5 final and that was repeated. Could you tell me how 6 final is the draft or how drafty is the final? 7 MR. CRAIG: The framework document that had 8 the overall plan and laid out was issued, as I said, 9 in May of 2003 for comment. And we are revising 10 those comments. And it will be issued in final. 11 But the thrust of the initiative was more along the 12 lines of what are the challenges we have. We don't 13 have a construction inspection program that we could 14 implement today as a result of the challenges. 15 As we look at what's going on around the country and 16 how plants are being constructed, we look at where 17 components are being fabricated, the inspection 18 program that's in place today, that's being 19 implemented would need to be revised to address new 20 construction and vendor inspections as well as, as 21 Sam mentioned, the vendor branch. They used to do 22 architect engineer NSSS inspections also. 75 1 There is a lot of questions to be asked and answered 2 as we overlay potential construction schedule with 3 procurement business decisions and regulatory 4 decisions. So I didn't want to leave you with the 5 impression that we didn't have significant challenges 6 ahead of us. 7 CHAIRMAN DIAZ: I know that Commissioner 8 Merrifield already went into this, but, 9 fundamentally, there is some significance differences 10 now. And I think what we want to make sure is that 11 the staff is putting the right amount of efforts and 12 resources in resolving those issues ahead of time. 13 They all come together, like Sam mentioned, where 14 there is the procurement of large items whether they 15 be steam generators or pumps, they all now have to be 16 put as a program that has significant ties between 17 one and the other. And it will end up -- supposedly, 18 in the future, we might have to actually conduct a 19 construction program. 20 Although, I would say that I don't know 21 whether -- the Browns Ferry unit is giving us some 22 opportunities to actually look at the way that the 76 1 old programs were done versus the new programs. It 2 does afford us an opportunity to train, at least, 3 some people. 4 MR. CRAIG: We are taking advantage of 5 Browns Ferry and the activities that have been going 6 on down there. That's been ongoing. We have been 7 having as well as NRR staff, regional staff go and 8 visit this site, look at what's going on and reflect 9 on what it means to our inspection program. 10 There are a number of international 11 activities that are ongoing. We had a number of the 12 vendor inspectors, previous vendor inspectors in 13 Canada looking at the international process to 14 qualify vendors. The nuclear utility procurement 15 initiative group, is the acronym, for NUPIG. 16 So we are trying to build on international experience 17 at the same time as well as build on some of the 18 experiences that has proven to be so effective at 19 shipyards. 20 CHAIRMAN DIAZ: Okay. So the answer is 21 that, yes, you do have the appropriate program to 22 move forward to be able to address these issues? 77 1 2 MR. CRAIG: And it is a work in progress. CHAIRMAN DIAZ: The mitigating system 3 performance index, which is something that I think is 4 becoming or has become a little contentious. Could 5 you dwell on it a little bit more? 6 What are the key issues or differences or problems or 7 what is the path forward? 8 MR. CRAIG: I will talk about it a little 9 bit. And I will ask Stu Richards -- he has been on 10 point for us -- to go up to the mike and talk about 11 it. 12 The performance indicator itself has some 13 technical aspects related to the PRA and utilization 14 that Stu can talk about. It would have taken the 15 findings -- that indicator out of the significance 16 determination process, so, if you will there, would 17 create a parallel to findings in the SDP. 18 And I will ask Stu to talk about it in some more 19 detail. 20 MR. RICHARDS: Chairman, I can give you a 21 short version of what has transpired over two years? 22 I'm not sure how much detail you want to go into. So 78 1 I will start talking and you can cut me off. 2 3 fine. 4 MR. RICHARDS: Well, we have been working CHAIRMAN DIAZ: A couple of minutes will be 5 on this for about two years. It was intended to be a 6 potential replacement for the safety system 7 unavailability PI which is presently in place. It 8 would cover the core safety systems of the plant. So 9 it makes it very important that we do this right. 10 RHR, low pressure, high pressure injection, the 11 diesels, the service water systems that cover those 12 components. 13 A couple of years ago, we formed a working 14 group with the industry. We have had a major role. 15 I think John already mentioned the major role was 16 played by Research. We also had OE involvement, 17 DSSA, and the four regions have been very heavily 18 involved in this. 19 We have had about 33 public meetings, two 20 workshops over the two-year period. A number of 21 these public meetings has been four to six hours 22 long. Not just short meetings. So a lot of dialogue 79 1 on it. We conducted a pilot program, nine sites with 2 20 units. We wrapped that up in 2003. 3 When that by pilot was done, we spent 4 several months considering what we learned from the 5 pilot, trying to work through the issues, again 6 through these public meetings with our stakeholders 7 and with a lot of involvement by both regions and 8 Research. 9 This fall, the industry took the position 10 that we had enough information to make a decision. 11 We agreed with that. We thought it was time to take 12 what we had and decide what to do. In December, we 13 had an internal stakeholder meeting where the various 14 participants and the NRC came together, and we spent 15 a day discussing the pros and cons and the various 16 viewpoints that we had on that. 17 And we also asked for written input from 18 the various offices that were involved. So we got 19 input from the four regions, from Research, DSSA and 20 NRR and from the Office of Enforcement. 21 The four regional administrators came out against 22 MSPI. Research recommended going forward. OE and 80 1 DSSA had caveats about how to go forward with it. 2 We analyzed the inputs and we came to a conclusion. 3 I would say that the pros for MSPI are is that it is 4 -- it counts both unavailability and unreliability 5 which the present PI does not. It uses site specific 6 PRA information, which the present PI does not. And 7 it provides a separate indicator for the cooling 8 support systems, which is not the present case. 9 The cons on the downside are that based on inputs 10 we got from the regional offices and then their 11 experience dealing with the pilot program, we think 12 that the resources to implement MSPI would be very 13 significant, perhaps as high as 50 FTE over a 14 two-year period of time, with about $3 million worth 15 of contract money to upgrade spar models. 16 We think that the ongoing FTE investment 17 would be significant in the neighborhood of about 3.4 18 FTE. This is driven in part by the fact that as a 19 performance indicator MSPI is very complex. We have 20 learned from the existing indicators that the things 21 that are not black and white, like scrams, you either 22 scram or you don't. You can't argue about that too 81 1 much. But when you start getting into areas of gray, 2 if you will, we can spend a lot of time discussing 3 those points. It is a voluntary program. But we 4 tend to try and work with the industry to reach a 5 consensus, if at all possible, on issues around PIs. 6 I think we would end up spending a lot of time 7 talking about MSPI and how it is implemented. 8 I might mention that it monitors in each 9 system about 30 to 50 components per system. Which 10 components it monitors depends on the specific 11 plant, looking at the specific PRA. 12 So you can get a feel for the amount of effort it 13 takes to just set this performance indicator up. 14 CHAIRMAN DIAZ: So it is the complexity of 15 it that you believe makes it difficult to implement 16 and then to continue it. You are not questioning the 17 value of it but the complexity of actually putting it 18 in place? 19 MR. RICHARDS: The complexity drives the 20 resources which is a major consideration. There are 21 technical issues, quite frankly, that were not 22 resolved. But when we sat down to make a decision, 82 1 rather than trying to deal with those individual 2 technical issues -- and I can provide you some of 3 those -- our decision was driven at a higher level by 4 the resources that it would take and the fact that it 5 would treat the components under MSPI, this being the 6 core safety is also in the plant, would treat those 7 components differently under the ROP than any other 8 part of the plant. 9 Part of the going in assumption that the 10 industry wanted to insist on this was that if we 11 implemented MSPI, we don't do significance 12 determination process reviews for those components 13 when they fail. 14 Now, there is exception to those. But by 15 and large, those most important systems in the plant 16 would now be subsumed into the MSPI and would no 17 longer be part of the SDP process, which is how we 18 treat the rest of the plant. 19 So, we had a lot of discussions about how 20 it is treated through SDP. And I think that was one 21 of the driving considerations for the regions, that 22 and the resources. That we would have no SDPs for a 83 1 lot of these failures and two ways of treating 2 components. 3 CHAIRMAN DIAZ: And there was no creative 4 process that actually either reduced the number of 5 variables to be able to arrive at a level that was 6 simpler but still was representative of what you were 7 trying to arrive at, which is an indicator of the 8 mitigating system? There was no simplifying approach 9 that came out of all of this discussion? It was just 10 either a complex indicator or index or back to the 11 old one. No -12 MR. RICHARDS: When we ask for comments 13 internally, and quite frankly, our goal was to look 14 for a way that MSPI could be implemented within a 15 reasonable resources serve our inspection program. 16 That's what we were trying to do. 17 When we went out for written comments from 18 the various involved parties, we asked: Are there 19 ways we can gain efficiencies? What can we do? 20 Think outside the box, be creative. Quite frankly, 21 the responses back were somewhat black and white. 22 There were ideas to go in parallel, keep the SDP in 84 1 place for several years. Some people suggested that. 2 And run MSPI along with it. But that does not 3 address the resource issue. And in, my mind, it only 4 prolongs the decision for another two or three-year 5 period. 6 By its nature when it first started out, 7 MSPI is a complicated indicator. By making it 8 risk-informed, you have go into the individual plant 9 PRA, look at the risk values for the various 10 components, define the boundaries around these 11 systems that are going to be included in this. 12 You have to consider what are we going to do when 13 they want to change the PRAs, which licensees 14 appropriately do. How are we going to keep up with 15 that. 16 I sat down with the lead staff member in 17 Research to try and get a personal feel for how 18 complex this would be. And after spending two hours 19 on a system I was familiar with having been an 20 inspector, I came away with the feeling that we are 21 going to have a lot of questions about implementation 22 that will take up a lot of our time. 85 1 CHAIRMAN DIAZ: All right. I think we will 2 continue to look at it. 3 MR. COLLINS: Chairman, in the interest of 4 raising potential policy issues, there are two 5 considerations that are at a different level. One 6 is there is a potential benefit to the industry -- Stu, 7 you can keep me accurate here -- of consolidating 8 data gathering in the reliability and availability 9 area. 10 Right now, there is multiple systems that 11 drive licensees to keep various types of information. 12 This PI as was originally proposed would help 13 consolidate that. 14 The second issue is the drive towards PRA 15 quality, which we have Commission direction on, and 16 the eventual approach, which is not an immediate 17 issue, but it is a future issue of do we want to rely 18 on licensee PRAs once the quality is established and 19 not keep the two models. Not keep the NRC SPAR 20 models as opposed to the licensee's PRA instructed 21 developed interface tool for the licensee's PRA 22 model. 86 1 And the MSPI would have us go into a different 2 direction potentially from that long term-goal. 3 MR. RICHARDS: If I could just add to that, 4 that the industry does have an initiative to have a 5 consolidated data entry process where they track a 6 number of different indicators through WANO and 7 through us. And they would like to consolidate that 8 so instead of tracking three things three different 9 ways, track one thing one way. And then they want to 10 do it all through INPO, I believe, as an efficiency. 11 I think one of the things we will do is take what we 12 learned from MSPI and try and see if we can apply it 13 to the existing SSU in some manner and there are some 14 ideas that we have that we would like to share with 15 industry that we can take those lessons learned, 16 apply it and maybe we can do things in the existing 17 PIs to make the data collection easier and use some 18 of the concepts that they put forward. 19 CHAIRMAN DIAZ: It appears it is an area 20 that is ripe for additional creative solutions. All 21 right. 22 MR. COLLINS: Stu, does the 87 1 MSPI align with -- I'm not clear -- with the 2 licensee's PRA or with the SPAR? 3 MR. RICHARDS: Well, we compared SPAR 4 models to licensee PRAs only for the systems that we 5 looked. And again, we only looked at two of the five 6 systems. 7 In a number of cases, generally speaking, 8 the SPAR models had to be updated to come in line 9 with licensee's PRA. But that was not always the 10 case. 11 I might note that there were discrepancies 12 between the two, the SPAR models and the PRAs, where 13 there was no agreement on how to resolve it. And 14 because it is a voluntary program there is no driving 15 force to come to some kind of an agreement. 16 One of the issues with MSPI and PIs in general is it 17 is a voluntary program. So if the industry and the 18 NRC disagree on the aspects of it, it makes it 19 difficult to come to some kind of conclusion. 20 CHAIRMAN DIAZ: Okay. Thank you. 21 Brian, I know you guys have been doing a lot of 22 license amendments. Is that because you put more 88 1 resources into it or you guys are getting so good at 2 it or both? 3 DR. SHERON: Well, I would like to say we 4 are getting good at it. But actually, we stayed 5 within budget with regard to the resources. It has 6 to do with the nature of the licensing action. 7 There were a number of orders. Orders, the closeout 8 of orders are counted as licensing actions. The 9 labor rate necessary to close out an order is a lot 10 less than a routine licensing action. 11 CHAIRMAN DIAZ: So nothing is being 12 shortchanged because you have so many license 13 amendments to close out? 14 15 DR. SHERON: No. MR. DYER: They are getting older, Mr. Chairman. We 16 received a briefing just before we came down here as 17 to what is the impact of the security review team 18 effort in that and on fiscal year 2004. As John and 19 Brian talked about, with our dedicated review is 20 going for the security plan in that. And the 21 inventory and age of our actions are increasing. And 22 those are going to be a challenge for the rest of 89 1 this fiscal year. And we may not meet our operating 2 plan goals that we have. We are still looking right 3 now at our compensatory measures. 4 CHAIRMAN DIAZ: Thank you. I know we are 5 running out of time but I do believe that the 6 material degradation program is an extremely 7 important program. And I know that sometimes we look at an 8 issue in itself. But I do believe like in many other 9 things, there is a point in which we need to look at 10 materials degradation as a wholesome issue. What is 11 it that is happening in different parts of the plants 12 so we can be assured that the appropriate protection 13 of the reactor cooler pressure boundary, whatever is 14 the issue. 15 I know you guys are doing it. But I just 16 want to insist that this is an area that cuts across 17 the different issues and it deserves our special 18 attention. 19 And again, the sump issue, I think, you 20 have heard from the Commission, and I am pretty sure 21 that Commissioner McGaffigan will re-emphasize that this 22 is something we want to do well, we want to do it as soon as it 90 1 can be done well. It is not something we want to 2 linger on. This is one of those cases in which the 3 enemy of the good is not only the better but the 4 enemy of the better is the best. We want to get it 5 done early. I think I have used most of my time. 6 Commissioner McGaffigan. 7 COMMISSIONER MCGAFFIGAN: Thank you, 8 Mr. Chairman. On the mitigating system performance 9 indicator -- I obviously have not followed this in 10 the detail that Stu Richards has and attended all 11 those six-hour meetings. But it does strike me that 12 some of the -- if we are going to be a risk-informed 13 agency, it would be nice to be able to make this a 14 success. 15 We have to figure out how to use licensees' 16 PRA's, three million of the dollars there were for 17 SPAR models and SPAR model updates to try to resolve 18 differences. Maybe we should just be using, as Sam 19 suggested, the licensee PRAs. 20 We originally did SPAR models, as I 21 understand it, because we wanted to have a simplified 22 tool that might even be public. And then 9-11 91 1 happened, and SPAR models are never going to be 2 public. So, if we can -- I think you all have to 3 think through whether there is, as the Chairman says, 4 some creative way to make this work. 5 I know SRAs are going to get tied up. Maybe we need more 6 SRAs. Again, if we are going to be a risk-informed 7 agency, maybe we need to have greater bench strength 8 in dealing with these complex issues. 9 So, you know, I don't know what the answer is. But 10 there was a significant amount of effort that went 11 in. 12 The one question that I would ask, whoever can 13 answer it, maybe it is Stu, the industry wanted stuff 14 that is in the MSPI indicator not to be in the SDP. 15 Was that because if they are going to get a color 16 anyway in the indicator if something goes wrong and 17 they didn't want to get double colored? 18 Has an SDP which was typically for an 19 inspection type finding, this is self-revealing -- we 20 have some data, they got the indicator, something 21 goes bad and they go from green to -- or is the 22 thresholds one of problems that you guys were saying 92 1 is something that you would color white or yellow 2 today in SDP space could still be merrily green in 3 the indicator, even though an important system had a 4 safety system unavailability? 5 MR. RICHARDS: Commissioner, first, I would 6 like to say I can't speak for why NEI wants to do 7 what they want to do. 8 COMMISSIONER MCGAFFIGAN: I assume they 9 don't want to get double hit. 10 MR. RICHARDS: Let me start by saying that 11 the SDP looks at discreet events. Nothing happens in 12 the plant that rises to a threshold of a performance 13 deficiency and a finding. You apply the -14 COMMISSIONER MCGAFFIGAN: I understand 15 that. So we have a safety system is unavailable 16 for a period of time and we would color that white. 17 Does the indicator -- does that get -- because it is 18 averaged and it's a bunch of things does that get -19 that could still be green over in indicator space? 20 MR. RICHARD: It could go either way. It 21 looks at a 12 quarter period of time. So you can 22 imagine -- it depends on where you start out. 93 1 COMMISSIONER MCGAFFIGAN: The indicator 2 could go bad even though you never had an event? And 3 you could have an events and the indicator could 4 still be green? 5 MR. RICHARD: You said that too fast for me. 6 The indicator -- first off, it is designed so that it 7 can't cross a green/white threshold with one event. 8 That is called the front stop. 9 There are people that disagree with that 10 because under SDP if you have a component that is 11 risk significant and its failure would be judged to be 12 significant enough to be a white finding, then it 13 should be a white finding. 14 COMMISSIONER MCGAFFIGAN: So it's a front 15 stop. You have convinced me enough. There is 16 complexity there. I don't want to spend the entire 17 time on this. 18 You are going to have a meeting this 19 afternoon. I'm just expressing some disappointment 20 that we couldn't make this thing work because there 21 was significant interest, I know, from Research, from 22 ACRS, from elsewhere. And if it is a matter of SRA 94 1 type resources, in all honesty, going forward -- I 2 mean I have this vision that is not necessarily 3 shared widely that we would someday be able to look 4 at licensee PRAs and judge them as to their quality and 5 all that. But that is if we are going to be a 6 risk-informed agency, we need more people who are 7 comfortable with these tools, who work with these 8 tools every day. And the fact that we might need 25 9 FTE more of such people, you know, it is a budget 10 issue but it is not the end of the world as far as I 11 am concerned. 12 MR. RICHARDS: Could I make one comment on 13 that, Commissioner? The SDP process that this would 14 replace is a risk-informed process that uses PRA and 15 it has the inspectors who are involved in the 16 finding -- it has people in the region. It is using 17 PRA. 18 The MSPI would stop all of that for those 19 findings. So where we would have been using the SDP 20 process to use PRA to gain better understanding in a 21 specific case, the MSPI would say until the PI 22 changes threshold, you know, we don't need to think 95 1 about any of that. 2 And once it changes threshold until it goes 3 again, no matter how many findings you have, once it 4 goes white, you don't need to do that discovery 5 process. 6 I would argue that what we have probably causes 7 people to be more involved in doing that discovery 8 and using PRA than once we get MSPI implemented. 9 COMMISSIONER MCGAFFIGAN: But the MSPI 10 would be everywhere and you chase events. I mean 11 what the PRA -- the SRA gets involved in is things 12 that he has to apply in an SDP to, which is not at 13 every plant. 14 MR. RICHARDS: Once the MSPI is in place, I 15 think the idea is it is a PI that covers those safety 16 systems. If an event is covered by MSPI, the staff 17 has no action until we cross a threshold. 18 COMMISSIONER MCGAFFIGAN: Part of the 19 Chairman's creative thinking is if -- I forget what 20 you called the bump, the first one does not count -21 the front stop. The front stop is something you guys 22 can talk about. It may be front stop is a 96 1 non-negotiable thing for NEI. 2 You have convinced me of the complexity. 3 You haven't convinced me yet that there isn't, as the 4 Chairman says, a creative way forward. But I will 5 turn it over to you guys this afternoon. 6 MR. CALDWELL: Just one comment from the 7 region, because all four regions disagreed with the 8 implementation. Although they found a number of 9 attractive aspects of the MSPI, but there is a number 10 of technical issues that would need to be resolved, 11 some of which could be done not that hard. Just like 12 the Chairman said, there are things that you could 13 do. 14 But our concern was primarily -- and it is 15 associated with this front stop -- but our concern 16 was primarily that we would have a risk-significant 17 issue occur and the MSPI would not allow us to 18 interact with the licensee over that issue. We would 19 know it was there. If we had used the SDP, it would 20 have been a risk-significant finding, and we would 21 have engaged the licensee with our action matrix. 22 There was a concern not knowing everything that we 97 1 need to know. The pilot wasn't, I don't believe, 2 enough of a test of the program to be able to tell 3 whether or not we would miss risk-significant issues. 4 In fact, even in the pilot they found a couple of 5 issues that would have been white via SDP that were 6 not via the MSPI. 7 8 of it. 9 Let me go on to other issues. The 87 COMMISSIONER MCGAFFIGAN: That's the heart 10 percent completion rate at the moment on less than 11 one year completion rate on licensing actions that's 12 driven primarily by the security stuff. You know, 13 you are about three times your goal. You want to 14 have only four percent more than a year old. And at 15 the moment, according to the latest data you gave us, 16 and which we gave Congress, we are at 13 percent. 17 That is a reflection of the security situation that 18 we are just being driven -- you are trying to manage 19 it and trying to get the most important ones done in 20 less than a year. 21 But we are going do have some that are 22 going to be more than the four percent goal, is that 98 1 right? In the expectation that Jim Dyer was trying 2 to give us is that this may continue, that this may 3 not get any better. 4 MR. DYER: With the additional security 5 effort that we are putting in for the rest of this 6 fiscal year, yes, sir. 7 COMMISSIONER MCGAFFIGAN: You want to add 8 anything to that? 9 MR. LEEDS: Basically that's it. Because of 10 all the work we are doing to support the orders and 11 to support all the security plan changes -12 13 COMMISSIONER MCGAFFIGAN: That's fine. MR. LEEDS: We are not going to make our 96 14 percent. 15 COMMISSIONER MCGAFFIGAN: You are not going 16 to make the 96 percent this year. 17 18 MR. LEEDS: Yes, sir. COMMISSIONER MCGAFFIGAN: This Commissioner 19 is okay with that. I mean, we set these goals. They 20 are aggressive goals. You are going to have to 21 manage and try do the best you can to get most 22 important ones done, the ones that most affect, let's 99 1 say, an outage or something like that. But you are not 2 going to be able to make 96 percent this year. 3 MR. LEEDS: Yes, sir. And that's what 4 we have done. We have gone through what the criteria 5 would be for the ones that we wouldn't be able to get 6 done within the year time frame. 7 COMMISSIONER MERRIFIELD: Can I just ask 8 one question? What have we done -- have we 9 communicated with our licensees so that they 10 understand where we are going with that? 11 MR. LEEDS: Yes, Sir, we have plans to. 12 We are just at the beginning. We are starting to 13 identify which licensing actions, which specific 14 licensing actions we will not be able to get done. 15 The first thing we are going to do is talk with the 16 licensees and say these are the ones, these are the 17 reasons why. And let them come back to us and say, 18 hey. We do need that. That supports whatever it 19 supports. 20 If we have something that is going to 21 affect the start up, of course, we are going to try 22 to get that done. So we are going through it in a 100 1 systematic way. 2 MR. SHERON: The idea is to pick licensing 3 actions that don't have major impact. 4 COMMISSIONER MCGAFFIGAN: I understand. 5 And I think this is -- part of the communication plan 6 was to tell us that today so that the word would go 7 out. I'm sure "Inside NRC", where ever they are, will 8 report this. 9 And GSI 189. It was not mentioned today 10 but I am always anxious to see that the other edge of 11 the sword that Shirley Jackson used to talk about. 12 So I'm anxious to hear when we can expect some 13 progress on this rulemaking for the ice condensers 14 and the BWR Mark 3, the additional power source for 15 the ignitors. 16 MR. SHERON: We are working with the 17 industry right now in terms of formulating the 18 structure of a rule. There are some issues that we 19 are trying to work through, the cost benefit. 20 Whether or not, for example, existing equipment could 21 be used in lieu of bringing in new equipment or the 22 like. I am going to ask Susie if she can could 101 1 say something about the schedule. 2 MS. BLACK: As you know, the cost benefit 3 was very close. So our goal is to work with the 4 industry over the next couple of months and come up with 5 a performance-based approach so that the costs stay 6 in line with the benefits. 7 COMMISSIONER MCGAFFIGAN: I'm for keeping 8 the costs in line with the benefits. The cost benefit 9 was close because we were using a median benefit. 10 There was a very large uncertainty, as ACRS pointed 11 out, with regard to this benefit because it is a very 12 complex calculation. The benefits could exceed cost 13 by a large margin, depending on this uncertainty. 14 MS. BLACK: That's true. Also the cost 15 could get out of control -16 COMMISSIONER MCGAFFIGAN: One staffer once 17 told me it was a Honda generator on a pickup truck. 18 But I guess it has gotten more complicated than that. 19 And all thing do go around here. 20 MS. BLACK: Right. We are working through 21 the cost benefit through these meetings with the 22 industry to put out the performance measures for 102 1 what this backup power source would have to be and 2 whether they can use existing sources. 3 So it will go to the rulemaking board later this 4 summer. 5 COMMISSIONER MCGAFFIGAN: I sure hope we can 6 make progress here because we don't have a lot of 7 examples of the other end of the sword, I don't 8 think, in our practice. 9 MS. BLACK: I absolutely agree. And, in 10 fact, the public has made comment on that as well. 11 COMMISSIONER MERRIFIELD: Setting aside the 12 comments about the double edge of the sword -- and I 13 agree with that. We have gone -- on many of these, 14 we said there are going to be pluses and minuses. But I would 15 say you always have to be concerned about any single 16 data point where someone says it is going to be fast 17 and cheap. 18 I always used to use the thing if somebody 19 tells me that something is going to be fast and 20 cheap, the first thing I do is grab my wallet. One 21 data point does not an analysis make. 22 COMMISSIONER MCGAFFIGAN: I'm going to come 103 1 back to this just briefly. I'm going to try to run 2 through a couple of things. The DOE has out a 3 solicitation for interest in a combined operating 4 license. Are you following that? And if we actually 5 have some folks who respond to that DOE solicitation 6 with a particular design in mind for other 7 application. The DOE program is, I guess, to 8 subsidize people to come in with a combined operating 9 license application, subsidize the up front costs. 10 Do you have plans to adjust your program to whatever 11 designs are chosen? And what would be the first 12 tangible interest from the industry of actually doing 13 a call? 14 MR. CRAIG: I will ask Jim Lyons to stand 15 up. He is following that very closely. 16 The short answer is yes. We 17 are monitoring that closely. Nobody has made an 18 announcement yet. 19 COMMISSIONER MCGAFFIGAN: What is the due 20 date for the DOE solicitation? 21 MR. LYONS: DOE solicitation is open through 22 this December. But as DOE has told us, that as they 104 1 get proposals, they are going to review those 2 proposals and act on them as they get them. So we 3 been following with them. 4 COMMISSIONER MCGAFFIGAN: But they have 5 none at this moment. 6 MR. LYONS: As far as I know, they have 7 none at this moment. We have periodic meetings with 8 them to see where they are and what's going on. In 9 fact, we have one this afternoon to meet out at DOE 10 with them. Our plan is always -- my program 11 especially can follow their money. 12 COMMISSIONER MCGAFFIGAN: Let me try to get 13 in two last, hopefully, short questions. 14 "Inside NRC" this week reviewed the annual or the 15 quarterly data that we put out on plant performance. 16 And they, as seen in an earlier summary that they had 17 done, thought they saw some trend in problem 18 identification and resolution problems at the plants. 19 So, probably on behalf of them, I ask you, do you agree that 20 there's a trend in the industry in problem 21 identification resolution as sort of an underlying 22 concern? 105 1 MR. DYER: Yes, sir. I tried to address 2 that, I believe, briefly at the Lessons Learned Task 3 Force meeting. One of the outcomes as we focused the 4 implementation of Davis-Besse Lessons Learned is our 5 focus on the PINR, as we revised the inspection module. 6 And as a result, I think we had 17 crosscutting 7 issues and 14 were in the problem identification 8 resolution area. 9 As part of our annual assessment, we are looking at 10 whether that is cause and effect of some of the 11 changes we have made to the problem identification 12 resolution or whether or not we have consistency 13 among regions. 14 I know Sam and I have talked about that. 15 Do we need to, as part of this, look into whether or 16 not we are going to need to, in fact, become even 17 more specific and structured in the -- in our 18 definition and what our expectations are during 19 the -- with the regions end of cycle reviews. I 20 know Sam is planning to discuss this issue as part of 21 our pre-agency action review meeting the deputy EDO. 22 COMMISSIONER MCGAFFIGAN: I should make 106 1 clear, I'm not on retainer to "Inside NRC" in asking 2 these questions. The last question is and it is 3 probably the one I wanted to ask first but I saved 4 for last. You mentioned at the very outset, 5 Mr. Dyer, this notion that you have a working group 6 that is going to look at, with NSIR, look at safety 7 security interfaces. And I think it is very 8 important, personally. And one of the questions I 9 would give to that group is: how do you decide when 10 these 1,300, 1,500 licensing actions a year come in, 11 which one of them have security implications? 12 It is probably a very, very small subset 13 that need to be brought over to NSIR and ask for 14 her input. But it could be that somebody is changing 15 a -- proposing a change in the system that is part of 16 a target set. And the safety folks probably don't 17 know what the target sets are at the plant, although 18 they may have a pretty good idea. And the change 19 could actually have adverse implications to security. 20 So I think you need a process for figuring out how to 21 do that. And, obviously, the security folks need a 22 process when they are doing something to make sure 107 1 that there are not safety implications to something 2 that they are going to be doing in security space. 3 So I urge you to try to think that through. 4 This, again, is consistent with yesterday's meeting. 5 Once we have this process in place, it may be 6 relatively invisible to the public. Because we are 7 not going to help folks, say, well, gosh, we focused 8 on this license amendment because this is a critical 9 element of the target set at the plant. 10 We can't tell that in public. But I 11 suspect it is a very small number of licensing 12 actions where you need to be looking. I also suggest 13 the task force look at the issue of whether 50.59(c) 14 needs to be amended to add an additional provision. 15 This is the provision for the members of the public 16 that lists when you can make a change under the 17 plant's own authority without coming in for a license 18 amendment. It is a long list. We did it a few years 19 ago. But there is no mention of security in 20 50.59(c). 21 So it is conceivable that a licensee, 22 again, in doing a 50.59 evaluation under the current 108 1 guidance might stumble into doing something adverse 2 to security, making a target set more easy to attack 3 or whatever unwittingly. So I urge to you think 4 about whether 50.59(c) might possibly need an amendment to 5 add an extra criterion. 6 MR. MATTHEWS: That is a specific item included 7 in a partition for rulemaking that the staff has 8 under review right now. And we made a preliminary 9 determination, sent it to the Office of Administration 10 and will be preparing a Commission paper to address 11 that. 12 COMMISSIONER MCGAFFIGAN: I didn't know 13 that. Thank you. 14 MR. DYER: And, Commissioner, this working 15 group that we are planning is just in its infancy 16 right now. We don't have a charter developed. But 17 it is a commitment from both Roy Zimmerman and myself 18 as well as at the division level and that within both 19 offices that this is something we need to do. 20 We have been doing it informally. We need 21 a more structured approach. 22 MR. COLLINS: Commissioner, I would say on GSI 109 1 189 -- I was thinking Reg Guide 1174 in the same context of 50.59 2 -- you mentioned that the staff moving forward into thresholds for 3 decision making. The context of the double-edged 4 sword is that if it is the right thing to do, whether 5 it passes the backfit or not, and if there is a way 6 to be implemented, either by rulemaking with a 7 backfit analysis or by licensee initiatives on a 8 different scale, then the information should stand on 9 its own and should be accomplished. 10 So clearly in some manner, the backfit 11 analysis and the rulemaking is a structured 12 regulatory initiative that is at one threshold and 13 probably at one level of effort. At a different 14 level of effort, though, if the risk insights for the 15 plants, and there is a limited amount of plants is still 16 appropriate, then, we would encourage a licensee to 17 take whatever action is cost effective to still 18 mitigate that consequence of a severe accident type 19 of event. 20 COMMISSIONER MCGAFFIGAN: The ACRS has 21 recommended a rulemaking. The approach has been 22 rulemaking. I guess all the licensees could jump 110 1 ahead and do what we wanted them to do. And that, 2 might make the rulemaking moot. But we would have to 3 somehow find a way to document that that happened. 4 And I believe one licensee may have done that. One 5 licensee caught up in a SDP, I think, told me at one 6 point -- I never verified whether they did it -- that 7 they were going to go and add that additional power 8 source for the ignitors at their particular facility 9 because they just didn't want to go through that 10 again. Okay. Thank you. 11 CHAIRMAN DIAZ: Okay. Thank you, 12 Commissioner, McGaffigan. 13 Commissioner Merrifield, you say you have a couple 14 of -15 COMMISSIONER MERRIFIELD: Yes. One of them 16 has already been asked. So I can shorten this very 17 quick. I guess the question I had -- you talked 18 briefly in slide 8 on the new reactors regarding 19 transition from pre-application design certification. 20 One of these in which I think it gets particularly 21 sensitive in the timing, I think is associated with 22 the CANDU ACR 700. 111 1 There has been an increasing amount of 2 attention in Canada of the notion of perhaps Ontario 3 Power looking at building some of those on their side 4 of the border. I think there has been some increased 5 attention on this side of the border and interest in 6 that design. I'm wondering are there any issues that 7 the Commission needs to be aware of at this point 8 either in terms of resources or other policy issues 9 that may be involved with our ability to effectively 10 and efficiently process through that process and 11 prepare you guys to do that design certification? 12 MR. DYER: Commissioner, let me have Jim 13 Lyons go to the microphone on that one for a detailed 14 review. I was in Canada two weeks ago. We are 15 keeping our channels open with the Canadian Nuclear 16 Safety Commission to make sure that we are 17 dealing constructively and on the same schedule for 18 our reviews in that. So we have opened the channels 19 of communication. 20 I know that Jim's folks as well as Research 21 have been spending a lot of time with the Canadian 22 Nuclear Safety Commission as well as them coming down 112 1 and spending time with us in that. 2 MR. LYONS: We have been trying to align 3 our schedules and align our work. And one of the 4 things that is going to cause us in the long run is 5 when they actually -- we are going through the 6 pre-application phase to try to identify if there are 7 any key issues that are going to cause us real 8 problems. 9 That's going to help define what it is 10 going to take for us to do the design certification 11 review. And we see that as a fairly significant 12 effort. And as John pointed out earlier, more than 13 what we are spending currently on the AP 1000. 14 So that's one of the areas where we are trying to 15 make sure that we have got resources budgeted for 16 that. In the next year, we have kind of shifted 17 resources around to make sure that we fully funded 18 our early site permit efforts because those are 19 actions that are in-house and that we are working on 20 to move forward on. 21 And so as we get the application in and we 22 see the extent that we need to do it, that's when we 113 1 are going to develop our schedules and work forward. 2 The real question is whether or not in the big scheme 3 of things that we are going to be able to meet 4 everybody's expectations on the time it will take us 5 to do those design certification reviews. 6 COMMISSIONER MERRIFIELD: I think in light 7 of the activities, lately, there is a fair degree of 8 interest in that design. I think we should be 9 preparing -- my own personal view is we should be 10 preparing ourselves to understand what we would need 11 to do, and if necessary, align our resources in such 12 a way as to accommodate user need. 13 That having been said, during the 14 presentation, there was ticked off a large number of 15 potential projects out there. We have a limited 16 number of staff who are key folks in these areas. We 17 have finite resources. 18 And I think it may well be that you are 19 going to need to have additional Commission 20 engagement in terms of prioritization or assisting 21 you with prioritization rather than just sort of 22 what's first in the door, because there may be some 114 1 people who have some reactor designs they would like 2 to have reviewed. But if there is nobody out there 3 that has any interest in looking at those designs for 4 the purpose of building one, I think we really 5 have to have that color how we are going to 6 align our resources. 7 But again, I would suggest that the staff 8 keep the Commission closely informed about that 9 progress so that we can provide the appropriate 10 policy recommendations to you in terms of helping to 11 align those resources the right way. 12 Thank you, Mr. Chairman. 13 CHAIRMAN DIAZ: Thank you, Commissioner 14 Merrifield. And I wanted to thank the staff again, 15 not only for the briefing but for the preparation for 16 the briefing. I think one of the most important 17 aspects of this briefing is that the staff needs to 18 get all the things in order so they can try to 19 organize their thoughts for the Commission. We 20 appreciate that. 21 We understand there is a tremendous amount 22 of work that goes into preparing these briefings. I 115 1 am sure that they serve to align your thoughts and 2 look at processes so we can get our thoughts in line. 3 I look forward to continue hearing on all those 4 critical issues. I think there are always something 5 that is challenged, as Sam normally says. 6 And I think sometimes there are problems and there 7 are solutions. And I think many, many 8 times it is important to look at a problem and reduce 9 it to practice by making the problem a little 10 simpler. And then you can always make it complicated 11 because we are very good at complicating things. I 12 think sometimes we need to make problems simpler for 13 us. 14 Technique for graduate school 101, reduce 15 the number of independent variables. That's a 16 fundamental issue. I really thought we had a great 17 meeting today, I appreciate it. 18 My fellow Commissioners have any additional 19 comments? We are adjourned. 20 (Thereupon, the briefing was adjourned) 21 22

Related docs
Board Meeting Materials Transcript[221]
Views: 0  |  Downloads: 0
2004
Views: 2  |  Downloads: 0
ACT, 2004
Views: 1  |  Downloads: 0
october 2004
Views: 1  |  Downloads: 0
2004 5
Views: 2  |  Downloads: 0
crash 2004
Views: 4  |  Downloads: 0
february 2004
Views: 0  |  Downloads: 0
MARCH 2004
Views: 0  |  Downloads: 0
september 2004
Views: 1  |  Downloads: 0
May 2004
Views: 2  |  Downloads: 0
january 2004
Views: 0  |  Downloads: 0
apr 2004
Views: 0  |  Downloads: 0
july 2004
Views: 1  |  Downloads: 0
February 2004
Views: 1  |  Downloads: 0
Other docs by 28e67f4eea39e2...